Overhead Construction Drawings
- A – 1Φ Assembly Units (Uploaded 13-Dec-2022)
- B – 1Φ to 3Φ Conversion Assembly Units (Uploaded 13-Dec-2022)
- C – 3Φ Assembly Units (Uploaded 13-Dec-2022)
- C – Double Circuit Configuration (Uploaded 13-Dec-2022)
- E – Guy Assembly Units (Uploaded 26-Nov-2019)
- F – Anchor Assembly Units (Uploaded 31-Aug-2018)
- G – Transformer Assembly Units (Uploaded 10-Aug-2021)
- J – Secondary Assembly Units (Uploaded 05-Jul-2012)
- K – Service Assembly Units (Uploaded 12-Jul-2012)
- L – Lighting Assembly Units (Uploaded 23-Jan-2023)
- M2 – Grounding Assembly Units (Uploaded 11-Oct-2022)
- M3 – Sectionalizing Assembly Units (Uploaded 31-Jan-2024)
- M5 – Miscellaneous Assembly Units (Uploaded 07-Feb-2024)
- M7 – Regulator Assembly Units (Uploaded 01-Mar-2021)
- M8 – Metering Assembly Units (Uploaded 18-Aug-2020)
- M9 – Capacitor Assembly Units (Uploaded 10-Apr-2013)
- M40 – Ties, Armor Rods, Warning Balls Assembly Units (Uploaded 10-Apr-2013)
- M41 & M42 – Angle & Deadend Shoes, Splices Assembly Units (Uploaded 10-Apr-2013)
- VUM – Underground Riser Assembly Units (Uploaded 17-Oct-2023)
- Z-35kv & Non-wood Pole Framing Assembly Units (Uploaded 21-Dec-2018)
- ZM – Non Wood Miscellaneous Assembly Units (Uploaded 10-Apr-2013)